Modeled load block
Modeled ±40%38,688MWh/YR
Annual energy
Modeled
15,109–20,920kW
Service band
Modeled
- Use class
- Multi-tenant commercial
- Load factor
- 0.38 Modeled
- Load shape
- NREL ComStock 2024 release, hot-humid / mixed-dry climate zones
- Model provenance
- Engineering priors + modeled load. Modeled ±40%.
← Replaced by measured interval data at this meter. T1 service headroom is a modeled starting point, not a utility or meter confirmation.
Flexible headroom
Modeled ±40%3.7–13.1 MW
Firm at system peak
Modeled
4.4–15.4 MW
Available off-peak
Modeled
Off-peak figure assumes curtailment or flexible operation during the ~5% of hours coincident with system peak. Modeled ±40%.
Headroom ladder
Engineering priors + modeled load| Tier | Modeled band | Delivery path | Binding constraint | Provenance |
|---|
| T1 | 3.5–9.3 MW | Within existing service | service sizing ← Meter interval data replaces this term | Meter-confirmable |
| T2 | 0.2–4.2 MW | New padmount transformer, existing feeder (24.94 kV) | feeder reserve rule | Modeled |
| T3 | 13.1 MW | Dedicated feeder from substation, ~0.0 mi | substation firm spare (allocated) | Modeled |
| T4 | 20.0 MW | New substation or transmission tap at 138 kV, 0.0 mi | transmission proximity | Modeled |
3.5–9.3 MW
Deliverable now
Modeled
3.7–13.1 MW
Deliverable with upgrade
Modeled
Upgrade binding: dedicated feeder from substation.